This paper designs the relay protection operation and maintenance management system based on big data, and expounds the system architecture, database design, system function modules and system implementation in detail. Selectivity is a mandatory requirement for all protection, but the importance of it depends on the application. While this is bad, It's not a. Protective circuit functional testing, including lockout relay testing, must take place immediately upon installation, every 2 years thereafter, and upon any change in wiring. Protective relays are your most powerful defense against long, costly outages and extensive. Acceptance tests fall into two categories : (i) On new relays which are to be used for the first time. (ii) On relay types which have been used earlier, only minimum necessary checks should. The development of big data technology and smart grid provides support for deep mining of historical data of relay protection systems. Over time, both older electromechanical relays and newer solid-state or microprocessor-based relays can wear down or fail in ways that are.
[PDF Version]