Connection: Explosion-proof distribution box and galvanized pipe should be connected with threaded connection and use explosion-proof junction box and explosion-proof switch. Need to use thick-walled pipe (galvanized water pipe), each connection also has special requirements. Open the terminal chamber cover, connect the cables through the cable gland to the terminals, ensuring both the internal and external ground wires are correctly connected. After confirming there. ABB's Control Room offering includes a comprehensive range of solutions designed to optimize the operator workspace for critical 24/7 processes across various industries.